8 TO 12 WEEKS, START TO FINISH.
Faster than a custom build. Slower than a tiny home delivery. We do this on the same calendar, every time — from the day you lock your placement to the day you hand keys to a tenant.
- WK 1–2Step 1Lock + Site Visit
Lock your placement → Dylan or Jeff calls within 5 minutes → site visit within 7 days. We confirm grade, access, and the actual setbacks with your town. Final all-in price quoted. Agreement signed.
- WK 3–4Step 2Permits + Verification
We pull the building permit with your town. Wetlands, septic, and zoning rules confirmed in writing. Your ADU enters the build queue.
- WK 5–6Step 3Site Prep + Foundation
Clearing, excavation, foundation poured to spec. Water, sewer, electric, and data trenched in from your house to the new pad.
- WK 7–9Step 4Set + Buttoned Up
ADU arrives on-site and gets set on the foundation. Roof tied in, exterior weather-sealed, utilities connected. From the outside it looks done.
- WK 10–11Step 5Interior Finish
Final electrical and plumbing. Flooring, fixtures, paint, appliances. Walk-through with you for any punch-list items.
- WK 12Step 6Inspection + Keys
Town final inspection. Certificate of Occupancy issued. Keys handed over. You can have a tenant in by the end of the week.
8 weeks if your lot is clear, permits sail through, and you pick a Bean / Strafford / Lee. 12 if you're on a flagship 2-bed, hit a wetland buffer review, or your town meets monthly.